Understanding Risks in the Construction Industry
by Jeffrey C Kadlowec, Registered Architect
Construction project consist of multiple phases and activities, each one unique and complex. They incorporate the interests of various stakeholders and require the efforts of many different parties [1]. The dynamic nature of design and construction means that risks can and will occur throughout the project phases. Implementing a risk management process (RMP) to prevent these issues and address them as they occur is essential to successful completion.
Project management is defined as, “the use of specific knowledge, skills, tools, and techniques to deliver something of value to people.” [1] This demands proper utilization of resources: materials, equipment and personnel. The element of risks and uncertainties—both expected and unexpected—create a work environment where procedures should be in place handle these difficulties or strategies must be developed and implemented to tackle problems as they arise.
Risk management has become important in decision-making throughout the construction industry. The consequences and potential damage cause by risk and uncertainty will negatively affect productivity, performance, quality and budget. While risks can never be eliminated entirely, reasonable efforts should be made to prevent, minimize, and contain them. Systematic risk management (SRM) is an approach to management that 1) identifies, assesses and ranks risks, 2) focuses on major project risks, 3) makes informed decisions against adversity, 4) minimizes potential damage in worst cases, 5) controls aspects of uncertainty in construction, 6) formalizes and clarifies the roles of companies, and 7) seeks opportunities to enhance performance [2].
The impact of risks is based on undesirable events and unexpected losses, with risk impact the product of likelihood and consequences. The true cost of risk is higher than apparent as uninsured costs can be eleven (11) times higher than the direct costs [2]. Uncertainty occurs at a greater degree early in the project lifecycle, as decision made in the beginning have the largest impact on final cost and duration. Changes are often necessary and unavoidable, but the impact of them is frequently underestimated.
Risks and uncertainty are inherent in any construction project. The allocation of risk is dependent the harm (or benefit) of activities, responsibility for the risk, accountability for control of risk, and financial duty—in whole or in part—should that risk materialize [2]. The most important risks are job safety, quality of work, and labor productivity which are those of the contractor. The lesser risks involve the owner in defective design, construction competence, delayed payment and inflation, government regulations and ordinances, and site access.
Risk assessment can be performed using qualitative or quantitative methods, or combination of both. Qualitative analysis studies documents, indicators and accidents utilizing questionnaires, consultants and personal inspections. Determinations are achieved through reviewing the development of risks, preparing engineering diagrams and studying environmental elements. Quantitative analysis employs numeric methods like discounting, cost-benefit, and breakeven. Probability can be illustrated through event and decision trees or through simulation models [3].
The construction phase of projects is fraught with uncertainty leading to cost overruns and performance shortfalls. Managing these element of risk relies on people and organizations, systematic processes, and tools and techniques [4]. It should focus not only on threats, opportunities and their implications, but also on the sources of these uncertainties. Since many risks lie outside the control of owners, project management teams must recognize and strategize against operational uncertainty during construction. This include factoring in the rule of law, market conditions, national culture, and geopolitics.
References
[1] Ghaeb, Hiba & Mahjoob, Ahmed. (2023). Risk Response in Construction Project: A Review Study. Journal of Engineering. 29. 121-137. 10.31026/j.eng.2023.08.09.
[2] Mills, Anthony. (2001). A systematic approach to risk management for construction. Structural Survey. 19. 245-252. 10.1108/02630800110412615.
[3] Khrustalev, Boris & Chudaikina, Tatyana & Kargin, Alexey & Agapova, Marina & Belyakov, Aleksey. (2023). Development features of integrated risk management system at construction enterprises. E3S Web of Conferences. 403. 10.1051/e3sconf/202340302009.
[4] Shabani, Rouzbeh & Johansen, Agnar & Torp, Olav. (2023). A Multi-Dimensional Evaluation of Uncertainty Management in the Construction Phase. 10.26493/978-961-293-086-8.
Good day I am so excited I found your blog page, I really found you by mistake,
while I was searching on Aol for something else, Nonetheless I am here now
and would just like to say thanks a lot for a fantastic post
and a all round interesting blog (I also love the theme/design), I don’t have time to read it all at the minute but I
have saved it and also added in your RSS feeds, so
when I have time I will be back to read a lot
more, Please do keep up the fantastic work.
Thanks! I’ll continue to post formal essays and research papers while completing a Master in Construction Management. The next one is titled, Cost Estimating and Profitability in Construction.